• picture_05.jpg
  • picture_04.jpg
  • picture_01.jpg
  • picture_06.jpg
  • picture_03.jpg
  • picture_02.jpg
  • picture_07.jpg
  • Home
  • References
  • Thermal wells

References for drilling thermal water wells

Location of wellDepthRunoffYear of construction
Jászszentandrás 650 m 600 l/min 1997
Szeged, North I/B district Exchange of strainer 1998
Kakasszék, Hospital Renovation of well 1998
Jánoshida 650 m 1200 l/min 1998
Bázakerettye 880 m 200 l/min 1998
Fertőd 960 m 520 l/min 1999
Cserkeszőlő 1400 m 2800 l/min 1999
Gelse 1800 m 50 l/min 1999
Jászkisér 760 m 880 l/min 1999-2000
Dévaványa B.28 1200 m 450 l/min 2000
Dévaványa B.59 further drilling 870 m 450 l/min 2000
Pusztaszentlászló, converting of well 1547 m 200 l/min 2001
Szeleste 1260 m 450 l/min 2001
Celldömölk 1250 m 200 l/min 2001
Celldömölk 1250 m 200 l/min 2003
Celldömölk 700 m 370 l/min 2003
Loipersdorf (Austria) 1900 m 250 l/min 2003/2004
St Jakob (Austria) 2400 m Directional drilling 2004/2005
St. Kanzian TH-1 1700 m 150 l/min 2005
Vel'ka Lomnica 2500 m 3600 l/min 2006
Seewinkwel TH-1 1100 m 500 l/min 2006
Kaprun TH-1 2500 m 180 l/min 2006
Szeleste 800 m 150 l/min 2006
Altenmarkt TH-1 2310 m   2007
Unterföhring TH-1 – TH2 3045 m/2578 m <80 l/min, <85°C 2009
Ismaning TH-1, TH-2 4032 m/2738 m <80 l/min, <80°C  2010/2011
Schlattingen (Schweiz) 2013 m   2013
Karpniki (Polen) 2010 m 17 l/min, <55°C 2013
Fürstenfeld/Frutura GT1 3278,5 m   2014
Fürstenfeld/Frutura GT2 3300 m <60 l/min, <123°C 2014
Fürstenfeld/Frutura GT1/A 3000 m Injetion 2014